Planned annual repair of Kozloduy’s fifth power plant.

The planned annual repair of the Kozloduy 5th power plant was started. EnergoService will participate in it with more than 15 engineers and specialists.

Ovation® systems and the primary circuit water system will be checked and serviced. The radiation monitoring system according to the technology was inspected and serviced before the start of the annual repair.

The activities are planned to be completed by the end of May.